Standard installation and commissioning for 9,000–12,000 BTU units.
With manufacturer kit
RON 500
Without manufacturer kit
RON 650
18,000 BTU
Standard installation and commissioning for 18,000 BTU units.
With manufacturer kit
RON 700
Without manufacturer kit
RON 850
24,000 BTU
Standard installation and commissioning for 24,000 BTU units.
With manufacturer kit
RON 850
Without manufacturer kit
RON 1,000
With kit: we use the kit supplied with your unit; an additional kit is not included.
Without kit: includes up to 3 m of complete refrigerant piping, a plug, wall anchors and outdoor-unit mounting brackets.
Calculate your installation cost
Choose your setup and add only the extra work you need.
Estimated totalRON 500
Additional service prices
13 services shown
Service
Price / unit
Removal of an existing unit
RON 150/ unit
Additional concrete wall penetration
RON 150/ unit
Additional masonry wall penetration
RON 75/ unit
Refrigerant piping extension by welding/connectors
RON 150/ operation
Additional refrigerant piping
RON 150/ m
PVC refrigerant piping cover
RON 50/ m
Condensate hose extension
RON 10/ m
Supply cable replacement/extension
RON 18/ m
8×200 mm screw and wall anchor set for 5–10 cm polystyrene insulation
RON 35/ set
Ladder installation up to 3 m, 9,000–24,000 BTU units
RON 100/ operation
Ladder installation above 3 m, 9,000–24,000 BTU units
RON 250/ operation
Window removal
RON 100/ unit
Cleaning and sanitisation
RON 300/ unit
What does standard installation include?
The package covers standard fitting and commissioning. For units with a manufacturer kit, we use the supplied kit. For units without a kit, we include:
Up to 3 metres of complete refrigerant piping
Electrical plug
Wall anchors
Outdoor-unit mounting brackets
What is not included in standard installation?
Masonry repairs, plastering, painting, wallpaper restoration and other finishing work.
Modifications or repairs to the property’s electrical installation.
Moving furniture or objects that obstruct installation.
Relocating the unit after installation.
General cleaning of dust produced during installation.
Two or more wall penetrations for the refrigerant piping route.
Concealing piping and electrical cables with masonry, PVC channels, decorative covers or other materials.
Installing protective awnings or covers for indoor/outdoor units.
Refrigerant piping extensions beyond the included 3 metres.
Warranty and Safety
24-month installation workmanship warranty
Speed Instal Economic provides a 24-month workmanship warranty for installation by its technicians, subject to the applicable warranty documents.
Proper maintenance
We recommend professional cleaning and inspection at least once a year, preferably before the warm season, or according to the manufacturer’s instructions. Missing annual cleaning does not automatically invalidate all warranty coverage.
Correct usage
Follow the manufacturer’s operating instructions.
Clean filters regularly.
Keep airflow unobstructed.
Arrange maintenance when performance deteriorates.
Situations that may affect coverage
Coverage may be affected where defects result from:
Unauthorised repairs or modifications.
Improper maintenance.
Electrical surges or external damage.
Mechanical damage.
Incorrect relocation or modification of refrigerant piping.
The manufacturer’s equipment warranty is separate from Speed Instal Economic’s installation workmanship warranty. These commercial warranties do not replace or limit statutory consumer rights; coverage is assessed according to the cause and applicable documents.
Important Information Before Installation
Existing refrigerant piping installed by third parties is not covered by our workmanship warranty.
The installation position must be agreed with you and assessed by the technician.
Share any known information about hidden cables, pipes and other installations.
Additional work may be necessary if the requested position is technically unsuitable.
Technicians will not proceed with work that cannot be carried out safely.